EMC計測・診断・電波暗室のご用命はトーキンEMCエンジニアリング

  • Top
  • 会社概要
  • プライバシーポリシー
  • カタログ
  • サイトマップ
  • お問い合わせ
ENGLISH
Anechoic Chamber

HOME >EMC Solution >Anechoic Chamber >Construction Example of an Anechoic Chamber

Construction Example of an Anechoic Chamber

 

Construction Example of an Anechoic Chamber

Click on image to expand.



 

Construction Example of an Attached Facility

Construction Example of an Attached Facility 01

 

Approach to pit in the anechoic chamber

 

Construction Example of an Attached Facility 02


Spectrum analyzer image projector/Automatic storage device in an anechoic chamber


Anechoic chamber under the floor storage system of the electromagnetic-wave absorber
(3 tier)



Anechoic chamber under the floor automatic storage system
of the electromagnetic-wave absorber

 

Construction Example of an Attached Facility 03


Completely even swing door


Completely even sliding door (5 x 5)



Shield window


 
〒213-0023 神奈川県川崎市高津区子母口398番地 特定建設業の取得  許可番号: 神奈川県知事許可(特-24)第66858号
044-751-2316(営業部)